Plug us in. We deliver. You move on. No delays. No rework.
MMATGC delivers your shell scope — foundations, CMU block, concrete, and framing — clean, safe, and ready for the next trade.
Hand us the shell scope and we handle it start to finish — coordinated, inspected, and turned over clean so your next trade walks onto a ready site. No delays, no surprises.
Stem walls, block walls by floor, elevator shafts, lintels — laid plumb, straight, and ready for inspection. We coordinate with your structural drawings and flag RFIs before they cost you time.
Footings, foundations, slab on grade, tie-beams, and elevated decks — formed, poured, and finished to your structural specs. We coordinate inspections so your schedule doesn't slip waiting on the county.
Floor-by-floor wood framing, trusses, blocking, sheathing, roof decking, and structural connections — built to your drawings and sequenced to your schedule. Turned over square, plumb, and ready for the next trade with no delays.
We're built to integrate cleanly into your project — no hand-holding, no schedule surprises. Here's how a typical engagement runs.
Send us your drawings. We review the shell scope, flag any coordination items, and come back with questions — not surprises on site.
You get a clean, itemized bid with scope breakdown and milestone dates tied to your master schedule.
We mobilize on your start date, work to your schedule, coordinate inspections, and keep the site clean. You'll hear from us — not about problems, about progress.
We walk the completed shell with your super, close out our scope, and hand it over ready for the next trade — on the date we committed to.
The things that create problems for GCs — failed inspections, messy sites, safety incidents, rework — are the things we've built our operation to eliminate.
The crew is on-site when we say we'll be there, working full days start to finish. No no-shows, no ghosting, no chasing us down. When your schedule depends on the shell, showing up isn't optional — it's the whole job.
OSHA-compliant practices, proper PPE, and safe rigging on every site. A safety incident on your job is your problem too — we make sure it doesn't happen.
Materials staged and stacked, debris cleared daily, access paths kept open for other trades. A clean site is a coordinated site — and it reflects on you as the GC.
A civil engineer (EIT) reviews the work against structural drawings at every stage before we call the inspector. Failed inspections cost you days — we don't fail inspections.
We're on-site daily, respond to questions same-day, and keep your team looped in on progress without you asking. No surprises, no radio silence.
A look at CMU block, concrete, and framing scopes we've completed for Tampa Bay GCs.
Three-story block shell — St. Petersburg
Block walls with cast-crete lintels
Three-story block shell — townhomes
Block walls with window openings set
Elevated waterfront block shell
First-floor block with upper framing
Three-story block front elevation
Multi-level block & framing shell
Concrete delivery for block cell fill
Block wall construction in progress
Laying CMU with cast-crete lintel
Waterfront block shell — crew at work
Continuous footing with rebar
Footing steel & vertical dowels for grouted CMU cells
Poured columns with tie-beam forms
Tie-beam formwork on block wall
Slab prep — vapor barrier & rebar mesh
Completed slab on grade
Slab rebar mat & footings
Elevated slab formwork
Slab pour — placing concrete
Concrete pump & ready-mix delivery on site
Pumping concrete into elevated beam formwork
Column formwork braced & ready for pour
Block first floor with framed, sheathed upper
Two-story shell — block base, framed upper
Floor truss system over main level
Elevated floor framing over waterfront lanai
Roof truss framing — great room
Interior stud walls under vaulted trusses
Roof & wall framing in progress
Interior partition framing
Framed interior with stair opening
Interior stair framing
Stair framing with window wall
Framed interior — depth to waterfront
Ground-level framing to waterfront
Great room framing with water-view slider
Three-story block shell with framed roof & canopies
Great room framing — panoramic waterfront
Ground-level framing opening to the dock
Floor-truss framing over covered lanai
Every shell scope we take on gets broken into a detailed activity schedule tied directly to your milestone dates — slab pours, deck dates, inspection holds. As a civil engineer (EIT) and PMP®-certified builder with 20 years in the field, I sequence every pour, inspection, and material delivery so your critical path never waits on us. Every phase of the structural shell gets civil engineer supervision — the block, concrete, and framing are checked against your structural drawings before we call the inspector, not after.
I'm Ash — a civil engineer (EIT), Florida Certified General Contractor, and PMP® with 20 years running structural shell scopes. I personally oversee every MMATGC job: I read your drawings, coordinate with your super, manage inspections, and turn over the shell on the date I committed to. Your schedule is the job — I run it like it's mine.
Across Hillsborough, Pinellas, Pasco & Hernando counties — all of Tampa Bay. Not sure if we cover you? Just ask.
Straight answers, fast. Call, email, or send the form and we'll get right back to you.